Some features of this site are not compatible with older versions of Internet Explorer. Upgrade your browser to better experience this site.

 
 
 
Plan Spec
HDR Engineering Inc
Decatur, GA

Central Transfer Station is a 2 story 120,880 sq. ft. trash transfer and administration facility. Shumate Mechanical installed the mechanical system per plan and specification. Equipment installed includes a Lennox rooftop unit, 4 split systems, Venmar energy recovery unit, 31 MetalAire variable air volume units, 2 variable frequency drives, 1 Bryan boiler, 3 Marathon pumps, McQuay unit heater, 2 McQuay package terminal a/c units and 3 louvers with actuator and control dampers. Additionally, an odor control system that mists water and chemical in the building was installed. Direct digital controls were installed by Johnson Controls.